GMK 5220 PDF

Limited space for installation of new air conditioning system on university building. Grove GMK is the best option in terms of capacity. Grove GMK A compact t Crane. With 68m main boom. Page 2. Terranova Group, Mytchett Road, Camberley, Surrey, GU16 6ET. Telephone All Terrain Mobile Crane | GMK Back to All Terrain. HOME. PRODUCTS. GMK KEY SPECIFICATIONS. TYPE, VALUE. Capacity, t, Capacity.

Author: Sajas Dolmaran
Country: Bolivia
Language: English (Spanish)
Genre: Music
Published (Last): 17 February 2007
Pages: 241
PDF File Size: 12.13 Mb
ePub File Size: 12.19 Mb
ISBN: 868-8-35560-882-7
Downloads: 55440
Price: Free* [*Free Regsitration Required]
Uploader: Zulukinos

Dual circuit, hydraulic power assisted steering with emergency steering pump. Axle lines 1, 2, 3 and 5 steer on highway steer by wire.

Independent horizontal and vertical movement control on each side of the carrier and from the operators cab. Special 5-axle chassis, all-welded torsion-resistant box type construction in high strength steel. Reach can be extended to up to m through the addition of jib attachments.

All wheels with independent hydropneumatic gmj and hydraulic lockout. On the day there were over 30 people from both Ravago and AsiaE working on the set up for the technical set of lifts. However, the roads surrounding the building were so narrow that even though the GMK was compact enough to access the lift site, in order to extend its outriggers AsiaE had to get special permission from the local council to dismantle some barriers.

TOP 10 Related  ENGINEERING MECHANICS STATICS BY J.L.MERIAM L.G.KRAIGE PDF

Grove GMK 5220

Andy Gagarin, project manager with Ohms-Psi Construction Trading, said the smoothness of the installation process prompted some celebrations on the project. Subscribe to the latest Manitowoc fmk. Load 520 and independent anti-two block system with audio visual warning and control lever lock-out. Aluminium, 2-man-design, safety glass, driver seat with pneumatic suspension, engine-dependent hot water heater.

Two speed transfer case with inter-axle differential lock. Back to All Terrain. The contractors in questions were, Ravago Equipment Rentals Inc.

Download Image Hi-res Low-res. Complete instrumentation and driving controls.

Although 7 hours were initially allocated for the work, in the end the whole project was wrapped up in just 4 hours. ECOS system with graphic display. Ergonomically arranged instrumentation and crane operating controls. The crane is also relatively narrow, with a 3 m width, and at the Far Eastern University site that was a plus. AsiaE was the logistics and delivery contractor, while Ravago, which is a multi-discipline industrial company, supplied the crane from its large rental fleet — one of the biggest in The Philippines.

GMK – All Terrain – Crane Load Technology

One by one, each lift was completed and all went exactly to plan, with no damage to any surrounding object despite the highly congested working area.

An on-site audience was gmm in attendance, as senior engineering students from the university were invited to watch the installation work.

Ravago recommended the crane not only because it had the strength, reach and maneuverability to make the lifts, 2520 also because it was fast enough to complete the job inside a day.

TOP 10 Related  HENRI CORNEILLE AGRIPPA PDF

The five-axle Grove GMK has a t maximum capacity and a 68 m main boom. Founded inThe Manitowoc Company, Inc.

Grove GMK-5220, 220t

Full electronic control of all crane movements using electrical control levers with automatic reset to zero. The crane operator set the lifting parameters in accordance with the engineering plans and the three lifting points for the chiller and accessories were set.

Manitowoc Direct Login Request Access. Two stage transfer case with inter-axle differential lock. Separate electronic hydraulic steer by wire steering of the 4th, and 5th axle line for all wheel steering and crabbing. Aluminium, full vision, tiltable approx.

Electronic level indicator with automatic levelling system. AsiaE calculated that the installation of the new aircon system would require three lifts, each of 14 t, to install the chiller plus another lift to position the 3 t of additional accessories, all of which would be lifted to the top of the building.

Longitudinal and transverse level control with automatic onhighway levelling system. Allison automatic SP, 6 forward and 1 reverse speed.